Our specialists support your Jet Grouting operations with expert guidance and on-site insight, helping you maintain control throughout execution:
- Rapid verification of column geometry and continuity
- Precise use of materials, avoiding overconsumption and waste
- Improved cost control and streamlined project timelines on site
An exclusive solution developed by Sixense
How Cyljet operates
Cyljet enables in-situ dimensional checking of injection columns during construction.
The solution is based on the Electric Cylinder method, and provides 3D investigation around the full circumference of the column.
A multicore cable with evenly spaced electrodes is installed at the centre of the column to record and process the potential differences generated by the induced electric current to produce a 3D image of the injected column.
Cyljet can equally be used to validate a test plot, as well as provide continual checking of injection quality as work progresses.
Reduce costs and save time with Cyljet
- Significant optimisation of operational costs:
Cyljet enables injection parameters to be calibrated to the highest-possible level of precision
- A robust and proven method:
Removes the need to excavate around columns to check the injection quality
- A quick solution:
Short implementation times and rapid availability of results (less than 48 hours after completion of measurements)
The added benefits of using our Cyljet solution
A unique method developed by experts in applied geophysics
The best ratio of on-site adaptability to speed of results
Easy, rapid implementation anywhere in the world via the international Sixense network
More than 4,000 columns measured worldwide
Download the Cyljet solution datasheet