๐ทโโ๏ธSince 2018, our teams from Sixense Northern America have been monitoring underground and surface conditions during construction of the LA Outfall as part of the hashtag ClearwaterProject, in Los Angeles, California, which aims to protect local waterways by replacing aging infrastructure.
This 11.25km long, 5.5m diameter tunnel connects the Carson Wastewater Treatment Plant and the Royal Palms Beach Outfall to the ocean.
To ensure the safety of the roads, public services and neighborhoods of the city through which this tunnel passes, we are using a variety of advanced tools to monitor the works:
– ๐ฒ๐ณ ๐ ๐ฃ๐๐ซ๐
– ๐ญ๐ญ ๐ฉ๐ช๐ฃ๐ญ
– ๐ด ๐๐ป๐ฐ๐น๐ถ๐ป๐ผ๐บ๐ฒ๐๐ฒ๐ฟ๐
– ๐ญ๐ฌ ๐ง๐ถ๐น๐๐บ๐ฒ๐๐ฒ๐ฟ๐
– ๐ฎ๐ณ๐ฎ ๐๐๐๐ผ๐บ๐ฎ๐๐ถ๐ฐ ๐จ๐ ๐ฃ๐
– ๐ญ๐ฐ ๐๐ ๐ง๐ฆ (๐๐๐ฐ๐น๐ผ๐ฝ๐)
– ๐ญ๐ฏ ๐ฉ๐ถ๐ฏ๐ฟ๐ฎ๐๐ถ๐ผ๐ป ๐ ๐ผ๐ป๐ถ๐๐ผ๐ฟ๐
– ๐ฎ ๐ก๐ผ๐ถ๐๐ฒ ๐ ๐ผ๐ป๐ถ๐๐ผ๐ฟ๐
๐กAll the data collected is transmitted in real time via our Geoscope data management software, which integrates the position of the tunnel boring machine to correlate instrument data with the progress of the works.